Three Star Hydropower Ltd (TSHL)

We have a fundamental analysis of Three Star Hydropower Ltd (TSHL).

Three Star Hydropower Ltd (TSHL)

Following is the company analysis of Three Star Hydropower Ltd (TSHL).

Introduction

Three Start Hydropower Ltd is a hydropower company that was established in 2072. Kumar Kharel, Mohan Karki, and Madhav Mainali are the co-founders of the company. The electricity generating capacity of the company is 7.151 MW. The project is located in Province 1, Haleshi Tuwachung Municipality, Khotang.

The promoter-public share ratio is 75: 25.

More Information

ParticularsInformation
Name of the companyThree Start Hydropower Ltd
SymbolTSHL
SectorHydropower
Share RegisterHimalayan Capital Limited.
No of Share4,925,000.00 Units
Face ValueRs. 100
Total Paid-up CapitalRs. 492,500,000.00
AddressMadyapur thimi, Bhaktapur, Nepal
Emailsapsu2016@gmail.com
Phone Number01- 6635080

Project Information

ParticularsInformation
Name of Project Sapsup Khola Small Hydroelectric Project
Type of Project Run-of-River
Installed Capacity 6.6 MW
Electricity Generation License received Mangsir 29, 2074
Generation Valid Date Mangsir 28, 2109
RCOD Poush 23, 2078
Total Cost Rs. 1.39 Arba
Cost per Megawatt in Rs. Rs. 21.06 Crores

Audited Financial Statement

Following are the information taken from the audited financial statement.

Particulars “000”FY 2076/77FY 2077/78FY 2078/79
Paid Up Capital297,348.00 369,375.00 369,375.00
Reserve and Surplus(13,090.00) (15,209.00) (52,992.00)
Debt190,237.00 816,213.00 937,290.00
Revenue43,588.00
Interest Expense
Net Profit(1,328.00) (2,119.00) (37,744.00)
Earnings Per Share(0.45) (0.57) (10.22)
Net Worth Per Share95.60 95.88 85.65
Debt Equity (Times)0.672.302.96
Return on Equity(0.05)(0.06)(1.19)

Capital Structure

Following are the detail information of Capital structure of the company.

ParticluarsPercentageNo of ShareAmount
Promoter Shareholding75%3,693,750.00 369,375,000.00
Project Affected locals10%492,500.00 49,250,000.00
General Public15%738,750.00 73,875,000.00
Total100%4,925,000.00 492,500,000.00

Board of Directors

The following are the company’s Boards of Directors.

Name of DirectorPosition
Mr. Kumar Kharel Chairman
Mr. Ang Ingma Sherpa Director
Mr. Pemba Tsering LamaDirector
Mr. Uddhav Raj ShivakoteeDirector
Mr. Jen LamaDirector
Mr. Subarna ShakyaDirector
Mr. Dhan Bahadur ShresthaDirector

Hence, these are the Three Star Hydropower Ltd (TSHL).

Frequently Asked Questions

a. Paid up Capital of Three Star Hydropower?

= Rs. 49.25 crore is the paid-up capital of three star Hydropower.

b. EPS of Three star Hydropower?

= In FY 2078/79, the EPS of three star hydropower is -10.22.

c. Three star hydropower share price?

= We can see the three start hydropower share price in NEPSE.

d. Electricity generating Capacity of Three Star Hydropower?

= “7.151 MW” is the electricity generating capacity of three star hydropower.

e. Address of Three Star Hydropower?

= Three Star Hydropower is located at Madyapur Thimi, Bhaktapur, Nepal.

f. Three Star Hydropower contact number?

= The phone number of three start hydropower is 01 – 6635080.

Other Important Links

EPS of Commercial Banks in Nepal.Top 10 highest dividend paying stocks in Nepal.
10 Highest Dividend Paying Banks in Nepal.Rules of Circuit Breakers in Nepse – Nepal.
20+ Low Capital Stock in Nepal.Top 10 Cheapest Stocks in NEPSE.

Corporate Office:

Address: Madyapur thimi, Bhaktapur, Nepal

Phone Number: 01- 6635080

Email: sapsu2016@gmail.com

Leave a Comment